ADR-0002 — requirements may be written ahead of the code, marked planned

Date: 2026-09-27 Status: accepted

Amends ADR-0001, whose first rule — "every REQ-#### in docs/specifications/ is something the service does today" — no longer holds without exception. The rest of ADR-0001 stands.

Context

ADR-0001 was written for a repository that had behaviour and no statement of it, and it closed with the case this record handles: "when the product conversation happens, the requirements it settles supersede these".

That conversation has happened. A manager attaching meters and correcting a member's role and area needs the registry to refuse a sensor already held elsewhere, to name a narrower action for the profile write, to hold areas to one primary substation each, and to refuse an import that breaks any of that. Several other repositories build on those answers at the same time — a dashboard, onboarding, the SDK — and each needs the registry's contract written down before the registry's code exists, so that all of them build against one statement rather than against each other's guesses.

Under ADR-0001 alone there are two ways to do that and both are wrong: write the contract somewhere other than the requirements, where no test can name it; or write it as ordinary requirements, which the projection would then report as unverified — indistinguishable from a requirement whose test was lost.

Decision

A requirement may land before the code that satisfies it, provided it says so.

  • It carries the line **Status:** planned directly under its heading.
  • It states the behaviour the code will have, as precisely as an implemented one, and names the decision record it comes from.
  • No test declares it yet. A @verifies tag naming a planned requirement is an error either way round: the status is stale, or the tag is wrong.
  • The change that makes it pass removes the status line in the same change as the code and the tests that declare it. An unmarked requirement is one the code does today, exactly as ADR-0001 defines it.
  • An implemented requirement is never rewritten to describe a planned change. Where a planned change alters existing behaviour, the existing requirement keeps describing today and gains a paragraph headed Planned pointing at the new requirement; that paragraph goes when the new requirement is implemented.

Consequences

The projection has three answers now, not two. A requirement is verified, unverified, or planned; docs/specifications/index.md gives the grep for the third. The checker that owns the matrix does not know the status line yet, so until it does, it will report planned requirements as unverified, and a reader has to subtract them by hand.

A planned requirement is a promise, and promises rot. One that sits planned for months is the aspiration ADR-0001 refused to write. The remedy is the same as for any stale document: delete it, or implement it — not leave it.

The temptation is to write the planned version into the implemented requirement because the diff is smaller. That makes a requirement describe behaviour the code lacks while its old tests still pass — the exact matrix-lies-to-the-reviewer outcome ADR-0001 exists to prevent.