1. System Defaults (config/defaults.yaml)

These are the baseline assumptions when the user doesn't specify custom values. Change these by editing the YAML file — never in code.

Parameter Value What it means Typical range
degradation 0.45%/year How much less energy the panels produce each year due to aging 0.3–0.6%
lid 1.5% "Light Induced Degradation" — extra production loss in the first year only (new panels stabilizing) 0–2.5%
performance_ratio 0.81 Ratio of real output vs theoretical max (accounts for heat, wiring, dirt). Reference only — already included in PVGIS data 0.75–0.87
retail_price 0.25 EUR/kWh What the user pays for grid electricity (from their bill) 0.18–0.35
energy_inflation 3%/year How much electricity prices rise each year 1–5%
general_inflation 2%/year General price inflation (for O&M and insurance costs) 1–4%
om_per_kwp 12 EUR/kWp/year Operations & maintenance cost per kWp installed (cleaning, monitoring, small repairs) 8–18
insurance_rate 0.35% of CAPEX/year Annual insurance cost as a fraction of the initial investment 0.2–0.5%
wacc 5.5% "Weighted Average Cost of Capital" — the discount rate used to calculate if the investment is worthwhile. Higher = more conservative 3–9%
useful_life 25 years How long the analysis runs (panel lifetime) 20–30
inverter_replacement_year Year 12 When the inverter needs replacing (it wears out before the panels) Year 10–15

Note: Inverter replacement cost is no longer a config value. It's computed by a power law in engines/finance.py — see section 9 below. | sharing_ratio | 55% | What fraction of energy fed to the grid counts as "shared" for the CER incentive. Depends on other CER members' consumption patterns | 40–70% |

2. Italian Incentives (config/incentives.yaml)

Tariffs and rates set by Italian regulation. Update when new decrees are published.

Parameter Value What it means Source
rid_tariff 0.07 EUR/kWh Price at which GSE buys your excess energy (Ritiro Dedicato) GSE PMZ
cer_tip 0.09 EUR/kWh (90 EUR/MWh) CER incentive tariff. Fixed for 20 years, never changes with inflation. Includes +10 EUR/MWh North Italy bonus Decreto CACER D.M. 414/2023
cer_cacv 0.0085 EUR/kWh (8.5 EUR/MWh) Additional CER component from ARERA (electricity system charges restitution) ARERA 727/2022
cer_duration_years 20 years How long the CER incentive lasts from activation date Decreto CACER
depreciation_coeff 9%/year Annual tax depreciation rate for roof-mounted PV (classified as "bene mobile") AdE 46/E/2007, 36/E/2013
depreciation_first_year_factor 50% First year you only get half the normal depreciation (Italian fiscal rule) Circular AdE

3. Tax Rates (config/tax_rates.yaml)

Parameter Value What it means Notes
ires 24% National corporate income tax (applied to RID + CER revenue only, NOT to self-consumption savings) Fixed by law
irap 3.9% Regional production tax (varies by region: 2.68–4.82%) Trentino = 3.9%
iva_impianto 10% Reduced VAT on PV system purchase (fully recoverable for businesses) Fixed by law

4. Solar Distribution Curve

File: celine_roi/pvgis_client.py

Used only when the user provides annual production manually (no PVGIS call). Distributes the annual total across 12 months following a typical solar pattern for Northern Italy (46°N latitude).

Month Fraction Meaning
January 4.9% Low winter sun
February 5.9%
March 7.8% Spring ramp-up
April 9.8%
May 11.8%
June 12.7% Summer peak
July 12.7% Summer peak
August 11.8%
September 8.8%
October 6.9%
November 3.9% Low winter sun
December 2.9% Minimum

These fractions are normalized to sum to exactly 1.0.

5. PVGIS API Settings

Parameter Value Meaning
loss 19% System losses sent to PVGIS (corresponds to ~0.81 performance ratio)
API endpoint https://re.jrc.ec.europa.eu/api/ European Commission Joint Research Centre (free, public)

6. Trentino Solar API

Parameter Value Meaning
API URL https://webgis.provincia.tn.it/wgt/services/solarIrradiance/statistics PAT WebGIS solar irradiance service
Coverage Trentino only (lat 45.67–47.09, lon 10.38–11.84) Returns error outside this area
Panel density 160 W/m² Assumed by the API when calculating max installable kWp from roof area
EPSG auto-detect Coordinates > 1000 → EPSG:25832 (UTM), else EPSG:4326 (lat/lon) Automatically chosen based on coordinate magnitude

7. Validation Thresholds

The tool automatically checks your results for common errors. These are the trigger values:

Regulatory Blockers (FAIL — model invalid)

Check Trigger Why
SSP regime Regime = "SSP" Scambio sul Posto abolished May 2025
CAPEX invalid CAPEX <= 0 Can't analyze a free system
Zero discount rate WACC = 0 Makes NPV meaningless
Sharing ratio invalid < 0 or > 100% Physically impossible
Loan > lifetime Loan duration > 25 years Loan outlives the system

Parameter Warnings (WARN — results may be unreliable)

Check Trigger Benchmark
Low degradation < 0.3%/year Industry standard: 0.4–0.5%
High degradation > 1%/year Unusual, check module warranty
Low O&M < 5 EUR/kWp/year Benchmark: 8–15 EUR/kWp
Low insurance < 0.2% of CAPEX Benchmark: 0.25–0.5%
High self-consumption > 80% without battery Very rare without storage
Atypical sharing ratio < 40% or > 70% Realistic range: 50–65%
Atypical CAPEX/kWp < 800 or > 1,500 EUR/kWp 2026 market range
No inverter replacement Year = 0 or cost = 0 Inverters need replacing around year 10–12
Zero grid export Immissione = 0 No RID/CER revenue possible

Math Invariants (automatic sanity checks)

Check What it verifies
Energy balance autoconsumo + immissione = production (tolerance: 0.01 kWh)
CER within immissione Shared energy cannot exceed what's fed to grid
NPV at 0% NPV(r=0) must equal the simple sum of all cash flows
Depreciation cap Total depreciation cannot exceed CAPEX
Production degrades Year 25 output must be less than year 1

8. CLI Defaults

When using the command line, these values are used if you don't specify them:

Argument Default Meaning
--kwp 0.0 (auto) System size in kWp. Auto-detected from rooftop polygon when --rooftop-wkt is used. Required otherwise.
--tilt 30° Panel tilt angle. Used by PVGIS for monthly production shape. Minimal impact when using Trentino rooftop polygon.
--azimuth 0° (south) Panel compass orientation. Same usage as tilt. Values: 0=south, -90=east, 90=west.
--user-type commercial Consumer category
--regime RID_CER Both RID and CER incentives
--equity-fraction 1.0 Share of CAPEX you pay upfront. 1.0 = 100% equity (no loan). 0.3 = pay 30% upfront, borrow 70%.
--loan-rate 0.0 Annual interest rate on the borrowed portion. Only used if equity-fraction < 1.
--loan-duration 0 Loan repayment period in years. Only used if equity-fraction < 1.
--config-dir config/ Where to find YAML files

How --equity-fraction affects the computation

What changes equity-fraction = 1.0 (cash) equity-fraction = 0.3 (70% loan)
Year 0 outlay -CAPEX (full amount) -CAPEX * 0.3 (30% of amount)
Yearly costs O&M + insurance only O&M + insurance + loan installment
Loan installment None Fixed annuity for loan-duration years
NPV Based on full upfront cost Based on lower upfront + yearly payments
IRR Return on full investment Return on equity only (leveraged, typically higher)
DSCR Not shown Shown — operating CF / loan payment per year

Example: 45,000 EUR CAPEX, equity-fraction = 0.3, loan 5% for 15 years: - Year 0: -13,500 EUR (not -45,000) - Years 1-15: ~3,040 EUR/year loan payment added to costs - Years 16-25: no loan payment - DSCR shown for years 1-15 (banks want >= 1.25x)

9. Inverter Replacement Cost (Power Law)

File: celine_roi/engines/finance.pyestimate_inverter_cost(kwp)

The inverter replacement cost is NOT a flat percentage of CAPEX. It's computed with a power law that captures economies of scale (larger systems → lower cost per kWp):

cost = 180 × kWp^0.82

With a floor of 1,200 EUR and a cap of 120,000 EUR.

Constant Value Meaning
BASE 180 EUR/kWp Cost intercept at 1 kWp
ALPHA 0.82 Sub-linear exponent (economies of scale)
FLOOR 1,200 EUR Minimum cost (labor + travel)
CAP 120,000 EUR Maximum (above this → central inverters, different pricing)

Reference table

System size Estimated cost EUR/kWp Market range
10 kWp 1,430 EUR 143 130–160
30 kWp 3,600 EUR 120 110–140
78 kWp 8,490 EUR 109 95–130
150 kWp 14,800 EUR 99 90–120
300 kWp 26,200 EUR 87 75–100
500 kWp 39,500 EUR 79 70–90

Fit on Italian market data ~2025 for string inverters (installed). If you have actual quotes from your installer, you can recalibrate BASE and ALPHA with scipy.optimize.curve_fit.